CPM Construction Managment: Scheduling By the Critical Path Method
de James J. O'brien
- Usado
- very good
- Estado
- Very Good/Good
- Librería
-
Newtown, New South Wales, Australia
Formas de pago aceptadas
Sobre este artículo
New York, U.S.A.: McGraw-Hill , 1965 The dust jacket has a bit of wear, with foxing, scuffs on the edges and a tear on the bottom spine. The page edges are lightly foxed and tanned, as are the inside covers. 254 pages. Books listed here are not stored at the shop. Please contact us if you want to pick up a book from Newtown.. Hardcover. Very Good/Good.
Reseñas
(¡Iniciar sesión or Crear una cuenta primero!)
Detalles
- Librería
- Goulds Book Arcade (AU)
- Inventario del vendedor #
- 166434
- Título
- CPM Construction Managment: Scheduling By the Critical Path Method
- Autor
- James J. O'brien
- Formato/Encuadernación
- Estado del libro
- Usado - Very Good
- Estado de la sobrecubierta
- Good
- Editorial
- McGraw-Hill
- Lugar de publicación
- New York, U.S.A.
- Fecha de publicación
- 1965
- Palabras clave
- [586G CONSTRUCTION MANAGEMENT BUILDING NOEBAY
Términos de venta
Goulds Book Arcade
30 day return guarantee, with full refund including original shipping costs for up to 30 days after delivery if an item arrives misdescribed or damaged.
Sobre el vendedor
Goulds Book Arcade
Miembro de Biblio desde 2013
Newtown, New South Wales
Sobre Goulds Book Arcade
A local, family-run bookshop, Goulds is a member of the Australian Booksellers Association (ABA).
Since 1989 Goulds Book Arcade was at the city end of King St, Newtown, but moved in late 2018.
The shop is now located at 536 King St.
That's directly opposite Alice St in south Newtown, near the New Theatre.
If you want to pick up ordered items from the shop please contact us first as the listed items are not stored at the shop.
Since 1989 Goulds Book Arcade was at the city end of King St, Newtown, but moved in late 2018.
The shop is now located at 536 King St.
That's directly opposite Alice St in south Newtown, near the New Theatre.
If you want to pick up ordered items from the shop please contact us first as the listed items are not stored at the shop.
Glosario
Algunos términos que podrían usarse en esta descripción incluyen:
- Edges
- The collective of the top, fore and bottom edges of the text block of the book, being that part of the edges of the pages of a...
- Jacket
- Sometimes used as another term for dust jacket, a protective and often decorative wrapper, usually made of paper which wraps...
- Spine
- The outer portion of a book which covers the actual binding. The spine usually faces outward when a book is placed on a shelf....
- Foxed
- Foxing is the age related browning, or brown-yellowish spots, that can occur to book paper over time. When this aging process...