Ir al contenido

Progress in Improving Project Management at the Department of Energy: 2001 Assessment

Progress in Improving Project Management at the Department of Energy: 2001 Assessment

Progress in Improving Project Management at the Department of Energy: 2001
Foto de archivo: la portada puede ser diferente

Progress in Improving Project Management at the Department of Energy: 2001 Assessment

de National Research Council, Division on Engineering and Physical Sciences

  • Usado
  • Bien
  • Tapa blanda
  • First
Estado
Bien
ISBN 10
0309082803
ISBN 13
9780309082808
Librería
Puntuación del vendedor:
Este vendedor ha conseguido 5 de las cinco estrellas otorgadas por los compradores de Biblio.
Silver Spring, Maryland, United States
2 copias disponibles en esta librería
(Puedes añadir más en el área de pago.)
Precio
EUR 35.00
O solamente EUR 31.50 con un
Membresía Biblioclub
EUR 4.67 Envío a USA
Envío estándar: de 7 a 14 días

Más opciones de envío

Formas de pago aceptadas

  • Visa
  • Mastercard
  • American Express
  • Discover
  • PayPal

Sobre este artículo

Washington, DC: National Academy Press, 2001. Presumed First Edition, First printing. Trade paperback. good. xi, [1],128 pages. Wraps. Illustrations. References. Appendices. Acronyms and Abbreviations. Staple holes in front cover, distribution memo laid in. Prepared under the auspices of the Committee for Oversight and Assessment of U.S. Department of Energy Project Management, Board on Infrastructure and the Constructed Environments, Division on Engineering and Physical Sciences, National Research Council. The Department of Energy (DOE) is engaged in numerous multimillion- and even multibillion-dollar projects that are one of a kind or first of a kind and require cutting-edge technology. The projects represent the diverse nature of DOE's missions, which encompass energy systems, nuclear weapons stewardship, environmental restoration, and basic research. Few other government or private organizations are challenged by projects of a similar magnitude, diversity, and complexity. To complete these complex projects on schedule, on budget, and in scope, the DOE needs highly developed project management capabilities. This report is an assessment of the status of project management in the Department of Energy as of mid-2001 and the progress DOE has made in this area since the National Research Council (NRC) report Improving Project Management in the Department of Energy (Phase II report) was published in June 1999 (NRC, 1999). The Phase II report findings and recommendations are reproduced as Appendix C. The findings presented in this report reiterate and expand on those given in the committee's January 2001 interim letter report, Improved Project Management in the Department of Energy (NRC, 2001), reproduced here as Appendix D. The Phase II report estimated that DOE projects costed taxpayers 50 percent more than comparable projects would cost if performed by the private sector or other government agencies, in large part because DOE did not use industry-standard best practices for project management. The Phase II report recommended, inter alia, that DOE develop policies, procedures, models, tools, techniques, and standards; train staff in their use; and require their use on DOE projects. It recommended further that DOE should develop and deploy a comprehensive project management system with clear definition of the specific roles and responsibilities of all parties associated with a project. As noted in the interim letter report, the department has taken a number of positive steps since the Phase II report. On June 25, 1999, subsequent to the release of that report, the deputy secretary, as the DOE chief operating officer, issued a memorandum announcing a project management reform initiative. This memorandum directed a number of actions to be taken to improve project management capability. These included the formation of the Office of Engineering and Construction Management (OECM) in the office of the chief financial officer (CFO) and the formation and strengthening of project management support offices (PMSOs) in the three major program secretarial offices (PSOs). On January 3, 2000, the deputy secretary issued an interim instruction to serve as policy guidance on critical decisions by acquisition executives (AEs) and the Energy Systems Acquisition Advisory Board (ESAAB) and on the conduct of corporate-level performance reviews. On June 10, 2000, DOE issued Policy P413.1, which addresses project management accountability, the establishment of project management organizations, project management tools, and training of personnel. DOE Order O413.3 was issued October 13, 2000, to implement the DOE policy document. O413.3 covered department policies on project management; provision for project engineering and design (PED) funding for preconstruction planning; reestablishment of the ESAABs; and other matters related to the management and oversight of DOE projects. Finally, the Program and Project Management (PPM) manual and a companion volume, Project Management Practices (PMP), were released in draft form in October 2000. The body of this report addresses certain specific areas that the committee believes needed greater definition and follow-up since the Phase II report. Not all the findings and recommendations in the Phase II report are repeated in the body of this report, although the committee continues to endorse them, so this report should be used in conjunction with the Phase II report.

Reseñas

Iniciar sesión or Crear una cuenta primero!)

¡Estás clasificando este libro como un obra, no al vendedor ni la copia específica que has comprado!

Detalles

Librería
Ground Zero Books US (US)
Inventario del vendedor #
43926
Título
Progress in Improving Project Management at the Department of Energy: 2001 Assessment
Autor
National Research Council, Division on Engineering and Physical Sciences
Formato/Encuadernación
Trade paperback
Estado del libro
Usado - Bien
Cantidad disponible
2
Edición
Presumed First Edition, First printing
Encuadernación
Tapa blanda
ISBN 10
0309082803
ISBN 13
9780309082808
Editorial
National Academy Press
Lugar de publicación
Washington, DC
Fecha de publicación
2001
Palabras clave
Strategic Planning, Process Improvement, Risk Management, Contingency Utilization, Independent Reviews, ISO 9000, Earned Value Management, Energy Department, Statistical Process Control, Front-End Planning, Risk Analysis, EVMS, Performance-Based, DOE

Términos de venta

Ground Zero Books

Books are offered subject to prior sale. Satisfaction guaranteed. If you notify us within 7 days that you are not satisfied with your purchase, we will refund your purchase price when you return the item in the condition in which it was sold.

Sobre el vendedor

Ground Zero Books

Puntuación del vendedor:
Este vendedor ha conseguido 5 de las cinco estrellas otorgadas por los compradores de Biblio.
Miembro de Biblio desde 2005
Silver Spring, Maryland

Sobre Ground Zero Books

Founded and operated by trained historians, Ground Zero Books, Ltd., has for over 30 years served scholars, collectors, universities, and all who are interested in military and political history.

Much of our diverse stock is not yet listed on line. If you can't locate the book or other item that you want, please contact us. We may well have it in stock. We welcome your want lists, and encourage you to send them to us.

Glosario

Algunos términos que podrían usarse en esta descripción incluyen:

Trade Paperback
Used to indicate any paperback book that is larger than a mass-market paperback and is often more similar in size to a hardcover...
First Edition
In book collecting, the first edition is the earliest published form of a book. A book may have more than one first edition in...
tracking-